Significant improvements were carried out to a 300m section of the Badenoch Way at Insh. It was hoped that the reinstatement of ditches and construction of culverts would be sufficient to dry out the poorly draining path and provide an adequate surface, however following completion of the first phase it was decided that a ‘cap’ of new surfacing was also required producing a 300m section of well drained and well surfaced path.
Path works/construction Date: 2009
Project | Classification | Status | Start Gridref | End Gridref |
---|---|---|---|---|
COAT | community | Maintenance | NH81825 01788 | NH81455 01438 |